800-353-9425

Posted on February 4, 2026

 Only a Qualified Person: such as a structural engineer: can verify that the building’s roof slab or steel beams can withstand the 5,000-pound load requirement for each socket pedestal. 
Read More

Posted on February 4, 2026

High-strength aluminum can hide stress fractures. Any davit arm that sustains an impact must be immediately removed from service and undergo non-destructive testing (NDT) to ensure its structural integrity is intact. 
Read More

Posted on February 4, 2026

 The longer the outreach: the higher the moment of force applied to the pedestal. We provide standard reaches up to 8.5 feet: but any custom outreach must be specifically engineered to prevent pedestal failure. 
Read More

Posted on February 4, 2026

 Technicians on suspended platforms must always be tied back to a secondary: independent anchor point. The davit supports the platform: but a separate Single Point Anchor (SPA) is required for the personal fall arrest system (PFAS). 
Read More

Posted on February 4, 2026

 Most suspended platforms should not be operated in winds exceeding 25-30 mph. High winds cause platform sway: which can result in the suspension cables jumping the sheaves or the platform striking the building facade. 
Read More

Posted on February 4, 2026

 Over time: structural fatigue or hidden corrosion can compromise an anchor. A 125% rated load test confirms that the socket: pedestal: and building attachment points remain capable of handling emergency forces. 
Read More

      X